Join me @ IBOtoolbox for free.
Barbarella Tilimon
Member Since: 6/12/2011
  
performance / stats
Country: Hungary
Likes Received: 1111
Featured Member: 1 times
Associates: 781
Wall Posts: 904
Comments Made: 902
Press Releases: 124
Videos: 2
Phone: 36202606093
Skype:     Barbarella Tilimon Realstew Mentor
profile visitor stats
TODAY: 7
THIS MONTH: 108
TOTAL: 71747
are we ibo associates?
business links
recent videos
active associates
Eugene Wallace    
Last logged on: 4/25/2019


Whitney Jacqueline     
Last logged on: 4/25/2019


Phil Successful    
Last logged on: 4/25/2019


Ann Moses    
Last logged on: 4/25/2019


Lonnie E. Shipe, M.A.    
Last logged on: 4/25/2019


Robert Coaster    
Last logged on: 4/25/2019


Dennis Thorgesen    
Last logged on: 4/25/2019


Athena Gay    
Last logged on: 4/25/2019


Lisa Yang    
Last logged on: 4/25/2019


Patricia Hudon     
Last logged on: 4/25/2019


Todd Treharne    
Last logged on: 4/25/2019


Pathway Global    
Last logged on: 4/25/2019


Marlena Burton    
Last logged on: 4/25/2019


Micky Gramlin      
Last logged on: 4/25/2019


John Madeira    
Last logged on: 4/25/2019


other ibo platforms
Barbarella Tilimon   My Press Releases

Our History again..

Published on 2/10/2017
For additional information  Click Here

www.zeomineralproduct.com

 

The expansion and reconstruction of the garage level firm was inevitable at the end of the century because of the growth in production and local residential complains.

 

 

That’s why in 1990, still in the built up area from Mád, at the outskirt of the town, in the garden of a private house, began the construction of a new, some hundred ton capacity factory, without any permission. The building of the factory began with the use of old equipment, as well as with from need born self-made machines. Because of lack of capital, there was no other possibility. The directorate did not permit the presence of outside or foreign investors. The expansion of the factory is continuous. To 1997 according to previous practice the firm used all of its profit on product development and expansion.

www.zeomineralproduct.com



Because of rapidly growing demands the capacity of the factory on Bartók Béla Street was not enough anymore, even though the work was continuously going on in 3 shifts. With the garden level factory the growing demands couldn’t be met and in a new EU directive industrial activities were banned in urban areas. Next to the continuous expansion 7 mining fields were laid down and started production with approved technical operating plans.

www.zeomineralproduct.com

The raw material provision got entirely into the hands of the firm. Thanks to this, the quality problems from other firms bought supplies ceased. At the same time an own labour was built from old and restored machines. The need of an own labour was motivated by production in the newly set quality system.

The mines that were now in the hands of the firm were partly, reopened old mines and thanks to new researches opened mines. The profits of the firm were used up on investments, purchase of land and permissions, but the firm didn’t need to obtain loans. At this time the following mines were opened:

www.zeomineralproduct.com
„Mád III. – zeolith, bentonit” (1991. year) 1995-1999 first  technical operating plans.
„Rátka V. - zeolith” (1996. year) 1997-2011 first  technical operating plans.
„Bekecs I..- calc-tuff” (1998. year) 2000-2004 first  technical operating plans.
„Mád IV. - bentonit” (1998. year) 200-2004 first  technical operating plans.
„Mezozombor II. - zeolith” (1998. year) 1999-2003 first  technical operating plans.
„Rátka VI..- bentonit, kaolin, quarzit”(1998. year) 1999-2003 first  technical operating plans.
„ Rátka VII.- zeolith” (1998. year) 1999-2003 first  technical operating plans.

www.zeomineralproduct.com

 

 

Shall I continue my Extremely Kind Reader?

Member Note: To comment on this PR, simply click reply on the owners main post below.
-  Copyright 2016 IBOsocial  -            Part of the IBOtoolbox family of sites.